Renovation and 1st Floor Addition

Kardinya

Description

AVP Projects was initially engaged to undertake extensive renovation work to the ground floor and subsequently invited back to perform further renovation work, which included:

Within 12 weeks, the client’s house was completely transformed and all renovation work was completed whilst the family continued to live in their home.

Testimonial

"We recently engaged AVP Projects to undertake a two stage renovation project for us on our 1980’s 2-storey home.

Stage 1 being to completely gut and redo our entire first floor. Stage 2 being to demolish the existing upper floor and “start again”, and then give the home a modern facelift on the front elevation, so it looked like a brand new, recently built residence.

We are pleased to say we couldn’t be happier with the results. Ian and Andy were a pleasure to work with – no ask was too big or too small, and I was really impressed with their attention to detail, and getting the job right.

Stage 1 was carried out with a minimum of fuss and everything went according to plan, on time and on budget – including kitchens, bathrooms, structural changes, the lot!

Stage 2 included the demolition of the upper floor, then encompassing the entire re-build, as well as all finishing items i.e. carpets, tiling and air conditioning etc. to a high quality.

It was handed over to us – taking only 3 and half months to complete, we couldn’t believe how quickly the second storey went up and we couldn’t be happier with the entire outcome!

Our home is now how we imagined it should be.

We would have no hesitation at all in recommending AVP Projects to anyone looking to undertake a project of a similar nature.

Thanks to Ian and Andy."